top of page
Projects
63rd St. Station, Second Ave. Subway Line Shoring
Temporary shoring at the second floor of approximately ninety feet of exterior bearing wall and storefront of a depression era six-story fully occupied apartment building. Read more at: https://www.structuremag.org/?p=7810
Read More
Bronx Plaza Structure Rehabilitation at the RKF Bridge
Complete temporary shoring design for all aspects of this bridge rehabilitation for this TBTA project
Read More
Bronx River Greenway Pedestrian Bridge Over The Bronx River
Complete construction procedure design providing temporary shoring in the Bronx River for the NYC DDC Project.
Read More
Eastern Parkway Brooklyn Museum Subway Station Excavation
Support of excavation design for the installation of three (3) elevators for the NYCTA at the Brooklyn Museum.
Read More
bottom of page