63rd St. Station, Second Ave. Subway Line Shoring Project NYC

63rd St. Station, Second Ave. Subway Line Shoring

Temporary shoring at the second floor of approximately ninety feet of exterior bearing wall and storefront of a depression era six-story fully occupied apartment building. Read more at: https://www.structuremag.org/?p=7810

RFK Bridge Rehabilitation

Bronx Plaza Structure Rehabilitation at the RKF Bridge

Complete temporary shoring design for all aspects of this bridge rehabilitation for this TBTA project

Bronx River Greenway Pedestrian Bridge Over The Bronx River

Complete construction procedure design providing temporary shoring in the Bronx River for the NYC DDC Project.

Eastern Parkway Brooklyn Museum Subway Station ExcavationPlaceholder Image

Eastern Parkway Brooklyn Museum Subway Station Excavation

Support of excavation design for the installation of three (3) elevators for the NYCTA at the Brooklyn Museum.

George Washington Bridge Rehabilitation of the 178th and 179th Street Ramps

Temporary shoring of ramps for fascia stringer replacements including bearing replacements, support of excavation and deck reconstruction design

Henry Hudson Bridge-Replacement of Lower Level Deck and Upper Level Curb Stringers

Temporary shoring for bearing replacements, gantry crane design, demolition and reconstruction design associated with the rehabilitation associated with these TBTA projects

Installation of East Side Coastal Resiliency

Temporary pedestrian bridge and ramps over the F.D.R.

NYCTA A-370150E – Accessibility Upgrades at the 149th Street Grand Concourse Complex on the Jerome Avenue/White Plains Road Lines

Reconstruction and Rehabilitation of the Upper-Level Approach Decks at the Verrazano-Narrows Bridge

Staten Island Approach Temporary Shoring for Pier Replacement

Reconstruction of the Upper and Lower Levels Toll Plazas and Southbound Approach at the Henry Hudson Bridge

400 ton compression and 160 ton tension test design for micro-piles at this TBTA project

Sprain Brook Parkway Shoring

Rehabilitation of 6 Bridges at Various Locations over the Sprain Brook Parkway

Temporary Shoring design for complete pier replacement for this NYS DOT Project.

Riverside Parkway Shoring

Rehabilitation of Riverside Drive Viaduct Over 158th Street

400 ton temporary lifting frame design for bearing replacements of large cantilevered floor beams over Amtrak railroad for this City of New York DOT Project.

Van Wyck Expressway Shoring

Van Wyck Expressway Viaduct Rehabilitation

Temporary shoring design for complete pier replacement for this NYS DOT Project.